Service 06

Move fast. Break nothing.

I've moved everything from 5-page brochures to 500-page platforms and 150-product stores. The new site is built and tested on staging, DNS flips at night, and your customers never notice. Redirects keep your rankings; MX records keep your email.

Typical moves
Host migration

Slow host to a fast one

Vabis' 150-product catalog moved from shared hosting to a VPS: zero downtime, every variant and stock level intact.

Platform migration

Wix or Squarespace to WordPress

All pages, images and posts migrated, design rebuilt faster, every old URL redirected. You get custom features and real SEO.

Recovery

Hacked with no backups

Restore from archives, rebuild the missing pieces, harden, and set up daily offsite backups so it can't happen twice.

01 · What you get

What you get Every time.

Pre-migration audit

Database size, plugins, PHP version, odd dependencies. Surprises are found before, not during.

Redirect mapping

Every old URL mapped to its new home with 301s, titles and metas preserved, sitemap resubmitted.

DNS and email continuity

MX, SPF, DKIM checked before the switch. Your email keeps working; it's the thing people get wrong most.

Staging first

Full copy tested on the new server before DNS changes. Rollback plan ready, rarely needed.

Automated offsite backups

Daily, stored away from the host, one-click restore. Set up as part of every migration.

30 days of support

I watch logs and Search Console after the move and fix anything that turns up.

02 · How it goes

How it goes Start to launch.

  1. 01

    Audit

    Current site, database, plugins, DNS and email setup. A list of everything that could bite.

  2. 02

    Plan

    Redirect map, DNS timing, email checks, a cutover window that suits your business.

  3. 03

    Stage and test

    Complete copy on the new environment, tested page by page, form by form.

  4. 04

    Cut over and validate

    DNS switched off-peak, every function re-tested, Google told where things moved.

04 · FAQ

Questions people ask Straight answers.

Will I lose rankings?

Not if it's done right. I map every old URL to the new one, keep titles and meta descriptions, and submit updated sitemaps. Rankings usually settle within two weeks.

How long is the downtime?

Usually zero. The new site is built on staging, tested, then DNS switches. For very large databases, 10–30 minutes at night.

What about my email?

I check and preserve MX records before the move and test delivery afterward. If your mailboxes live with the old host, I migrate those too.

Can you move big databases?

Yes. MySQL, PostgreSQL, SQLite. For 10GB+ I use incremental transfers and integrity checks to prevent corruption.

Got a site, a bug, or an idea? Send it over.

You'll get a flat price and a start date today. No pitch deck, no discovery phase.